Webusing the idot trench backfill tables a b f e c all trench backfill will be measured using the idot trench backfill tables detail sheet city of des plaines public works and engineering … WebStandard Specifications for Road and Bridge Construction
Idot trench backfill tables
Did you know?
Web3/4" thickness does not meet the minimum compacted thickness table in article 406.06 for a 9.5 mix. Will the minimum thickness requirement be waived? An addendum will be … Web608.2.2.3 Trench Backfill (1) Furnish trench backfill material conforming to 209.2 or 520.2.5.2. 608.3 Construction 608.3.1 Excavation 608.3.1.1 General (1) Unless the contract specifies otherwise or the engineer allows, perform sewer construction in open trenches and in a way that protects pipelines or sewers from unusual stresses.
WebPlan sheet 155, Utility Trench Bedding detail on the left side of the detail shows that bedding to 12" over the proposed utility is incidental and on the right side of the detail it states that trench backfill will be paid from the spring line of the proposed utility. WebMaterial Approvals Aggregate Aggregate Various tests, including quality, freeze-thaw, and alkali-silica reactivity (ASR) are performed on aggregates used for road and bridge …
WebThe backfill material for trenches made in the subgrade of the proposed improvement, and trenches where the inner edge of the trench is within 2 ft (600 mm) of the proposed … WebA. Trench Excavation. 1. Notify the Engineer prior to the start of excavation activities. 2. Remove topsoil to a minimum depth of 12 inches (300 mm) and stockpile. 3. Excavate …
Webrequirements of Table 3 unless modified by the Engineer in writing. Table 4 Sand Backfill- For Services Sand No. Percent Passing No. 4 Sieve 95 Passing No. 200 sieve 8 804.5 CONSTRUCTION: All existing utilities shall be protected from damage during the excavation and backfilling of trenches and, if damaged, shall be replaced by the Contractor
WebF. Special Backfill Material. Meet the requirements of Section 4132. 2102.03 Construction. A. General. 1. to Section 2107. 2. materials as indicated in the contract documents and from borrow pits, exclusive of that designated as channel excavation. 3. material necessary to provide suitable approaches from intersecting highways dolly parton song my tennessee mountain homeWebYou can download PDF versions of the user's guide, manuals and ebooks about idot trench backfill table, you can also find and download for free A free online manual (notices) … dolly parton song here you come againWebThe following is a list of manuals and guides, which includes instructional materials such as Special Provisions and Type, Size, and Location documents. Please utilize the search … dolly parton songs cowboy casanovaWebhorizontal backfill surface. The Tables illustrate increasing soil-wall friction angles (δ). Table 2 - Coulomb Active Pressure Coefficient δ (deg) φ (deg) 0 5 10 15 20 28 .3610 .3448 .3330 .3251 .3203 30 .3333 .3189 .3085 .3014 .2973 32 .3073 .2945 .2853 .2791 .2755 Table 3 - Coulomb Passive Pressure Coefficient δ (deg) fake hair for womenfake hair dont careWebSection 4132. Special Backfill Material 4132.01 DESCRIPTION. · Crushed stone, crushed PCC, crushed composite pavement, or reclaimed HMA, · Mixtures of gravel, sand, and soil, or · Uniformly blended combinations of the above. · Do not place Reclaimed HMA below high water table. 4132.02 GRADATION. dolly parton song coat of many colors lyricsWebYes, the fine and coarse aggregate materials for trench backfill per 1003.04 and 1004.05 are allowed. (02/25/2024 ) The trench backfill special provision page 11, calls for 6" of … dolly parton songs cry pretty